On Going Projects
To meet MWCI's aim of providing potable water in the East Zone Concession, specifically within Antipolo, Teresa, and other neighboring municipalities of Rizal. The project was conceptualized to de-load Angat water source dependency, which upon completion, will significantly improve and provide additional water supply.

Client:
Manila Water Company Inc.
 
Target Completion Date: 
2022
 
Specific Scope:
  • Pipelaying of 800 mm Ø Steel pipe with a distance of 5.153 Km (Package 3B) and 3.272 Km (Package 3C) which includes the construction of Pipe Bridge, Pipe Tunneling and Pavement Restoration that will convey the treated water from the Calawis Water Treatment Plant going to the Kaliwa Transmission Line with 1600 mm Ø Steel Pipe located along Marulaque Road, Antipolo